• Project Name: Wrexham Police Head Quarters
  • Location: Wrexham
  • Duration: 24 Weeks

Following numerous months of tendering along with an extensive Pre-Qualification and Validation of our services, we were selected as Demolition Enabling Works Contractor for the Prestigious Wrexham Police Head Quarters.

As a Leading Innovative Demolition Contractor, the methods of deconstruction were selected based on safety related requirements of the site and condition of the building, all low level buildings were demolished using our Specialist Demolition Excavators and equipment. The main Control Tower for the Headquarters was imploded which required months of careful planning leading up to the blast.

Prior to any structures being demolished an extensive asbestos removal works package was carried out and all structures were soft stripped ready for demolition. The Control Tower however required careful preparation to ensure that the implosion was a success.