The British Standard BS 6187:2011 is the Code of Practice for Full and Partial Demolition in the UK. This standard provides comprehensive guidelines for the planning, execution, and management of demolition projects, ensuring safety, environmental protection, and regulatory compliance. This section serves as an in-depth guide to BS 6187:2011, outlining its purpose, key provisions, and best practices for adherence.

Purpose of BS 6187:2011

The primary objectives of BS 6187:2011 are:

  1. Ensure Safety: Protect workers, the public, and adjacent properties from the hazards associated with demolition activities.
  2. Promote Best Practices: Encourage the adoption of best practices in the planning and execution of demolition projects.
  3. Environmental Protection: Minimise the environmental impact of demolition works, including waste management and pollution control.
  4. Regulatory Compliance: Ensure compliance with relevant laws, regulations, and standards.

Scope of BS 6187:2011

BS 6187:2011 applies to:

  1. Full Demolition: Complete demolition of structures, including buildings, bridges, and industrial plants.
  2. Partial Demolition: Selective demolition, including the removal of specific parts of a structure while preserving others.
  3. Site Clearance: Preparation of the site for redevelopment, including the removal of debris and hazardous materials.

Key Provisions of BS 6187:2011

1. Project Planning and Management

  • Feasibility Studies: Conduct feasibility studies to assess the viability and safety of the proposed demolition project.
  • Project Planning: Develop a detailed project plan outlining the scope, timeline, and resources required.
  • Risk Assessments: Perform comprehensive risk assessments to identify potential hazards and implement control measures.
  • Health and Safety Plans: Prepare health and safety plans in accordance with the Construction (Design and Management) Regulations 2015 (CDM 2015).

2. Pre-Demolition Survey

  • Structural Survey: Conduct a structural survey to assess the condition and stability of the structure to be demolished.
  • Hazardous Materials Survey: Identify and assess the presence of hazardous materials, such as asbestos, lead, and PCBs.
  • Utility Survey: Locate and isolate utilities, including gas, water, electricity, and telecommunications, to prevent accidents during demolition.

3. Environmental Considerations

  • Waste Management: Develop a waste management plan to handle demolition waste, including segregation, recycling, and disposal.
  • Dust and Noise Control: Implement measures to control dust and noise emissions, protecting workers and the surrounding community.
  • Wildlife and Habitat Protection: Assess and mitigate the impact of demolition activities on local wildlife and habitats.

4. Demolition Techniques

  • Mechanical Demolition: Use of machinery such as excavators, cranes, and bulldozers for structural demolition.
  • Explosive Demolition: Controlled use of explosives for the demolition of large structures, following strict safety protocols.
  • Manual Demolition: Hand tools and manual labour for precise and controlled demolition, often used in sensitive or confined areas.
  • Special Techniques: Specialised methods for dealing with unique challenges, such as underwater demolition or high-rise structures.

5. Site Safety and Security

  • Site Access Control: Implement measures to control access to the demolition site, ensuring only authorised personnel are present.
  • Perimeter Fencing: Erect secure fencing around the site to protect the public from hazards and prevent unauthorised access.
  • Emergency Procedures: Establish and communicate emergency procedures, including evacuation plans and first aid provision.

6. Post-Demolition Activities

  • Site Clearance: Remove debris and clean the site, ensuring it is safe and ready for redevelopment.
  • Environmental Remediation: Address any environmental contamination issues, restoring the site to a safe condition.
  • Final Inspections: Conduct final inspections to verify that all demolition activities have been completed in accordance with the project plan and regulatory requirements.

Compliance and Best Practices

1. Early Planning and Involvement

  • Early Engagement: Involve all stakeholders, including clients, contractors, and regulatory bodies, early in the planning process.
  • Detailed Documentation: Maintain detailed records of all assessments, plans, and actions taken throughout the project.

2. Regular Monitoring and Review

  • Site Inspections: Conduct regular site inspections to ensure compliance with safety standards and project plans.
  • Risk Reassessment: Continuously reassess risks and update control measures as necessary throughout the demolition process.

3. Training and Competence

  • Competent Personnel: Ensure that all personnel involved in demolition activities are trained and competent in their roles.
  • Continuous Training: Provide ongoing training and development to keep skills and knowledge up-to-date.

4. Effective Communication

  • Clear Communication: Maintain clear and open lines of communication between all parties involved in the project.
  • Stakeholder Engagement: Engage with stakeholders, including the local community, to address concerns and provide updates on progress.

BS 6187:2011 provides a comprehensive framework for managing demolition projects safely, efficiently, and in compliance with regulatory requirements. By following the guidelines and best practices outlined in this standard, stakeholders can ensure that demolition activities are carried out in a manner that protects health, safety, and the environment. This guide offers a detailed overview of the key provisions and practical advice for implementing the Demolition Code of Practice, supporting successful project outcomes.

This comprehensive guide on the Demolition Code of Practice BS 6187:2011 is designed to inform and assist individuals and organisations involved in demolition activities. By adhering to these guidelines, you can ensure compliance, enhance safety, and promote best practices in the planning and execution of demolition projects.

totaldemolition-shapedivider-2@1x
totaldemolition-icon-map-red

Discover total.

Explore our range of solutions designed to meet the diverse needs of our clients, from precision dismantling to environmentally conscious asset recovery.

Talk to us about your next project