PEEL PORT
Project Details.
We are proud to be awarded the extensive Demolition & Asbestos Enabling Works package at Peel Ports, Heysham, we were..
Project Duration
.
0
Weeks
0
Days
Location
HEYSHAM
Status
Completed
July 2022
Project Value
£375K
Recycling Rate
0%
Number of Site Staff
0
Services.
A range of services performed, reflecting Total Demolition's diverse capabilities and comprehensive solutions.
Asbestos| Demolition| Project Management| Soft Strip Works
Key Challenges & Solutions.
Key Objectives:
- Safe Dismantling of Structures: Carefully dismantle the industrial units, focusing on maintaining structural integrity throughout the process to prevent uncontrolled collapses.
- Asbestos Removal and Disposal: Identify, safely remove, and dispose of asbestos roof sheeting and any other ACMs found within the structures.
- Environmental Protection: Implement measures to prevent the release of asbestos fibers into the environment, ensuring compliance with environmental regulations.
- Health and Safety Compliance: Prioritize the safety of all personnel involved, adhering to stringent health and safety protocols throughout the project.
- Efficient Project Execution: Complete the dismantling and asbestos removal within the agreed timeframe and budget, minimizing disruption to surrounding areas.
Key Challenges and Solutions:
- Handling Asbestos-Containing Roof Sheeting:
- Challenge: Asbestos roof sheeting poses a significant health risk due to the potential release of harmful asbestos fibers during removal and handling.
- Solution: Conduct a thorough pre-project asbestos survey to assess the extent of ACMs. Employ licensed asbestos removal contractors to manage the safe removal of the asbestos roof sheeting. Use controlled wetting methods to suppress dust during removal, and encapsulate the sheets before handling. Workers will be equipped with appropriate personal protective equipment (PPE), including respiratory protection, and work within designated asbestos containment zones.
- Maintaining Structural Integrity During Dismantling:
- Challenge: The dismantling of large industrial units requires careful planning to ensure that the structures remain stable until they are safely deconstructed.
- Solution: Develop a phased dismantling plan, starting with the non-load-bearing elements and progressing to the main structural components. Structural engineers will be involved to assess the integrity of the units throughout the dismantling process. Temporary supports, such as shoring and scaffolding, will be used to stabilize the structures during critical stages of the project.
- Environmental Protection and Waste Management:
- Challenge: Preventing the release of asbestos fibers into the surrounding environment is critical to avoiding contamination and meeting regulatory requirements.
- Solution: Implement stringent environmental controls, including the use of sealed work areas and negative air pressure systems to contain asbestos fibers. Regular air quality monitoring will be conducted to detect any airborne asbestos and ensure that levels remain within safe limits. All asbestos waste will be double-bagged in approved containers, labeled as hazardous waste, and transported by licensed carriers to certified disposal facilities.
- Health and Safety Compliance:
- Challenge: Ensuring the safety of all personnel involved in the project, given the risks associated with asbestos and the structural work required.
- Solution: Develop a comprehensive health and safety plan that includes risk assessments, safety protocols, and emergency response procedures. All personnel will receive asbestos awareness training and be required to follow strict safety protocols, including the use of PPE and decontamination procedures. Safety officers will be on-site throughout the project to enforce compliance and conduct regular safety audits.
- Logistical Coordination and Site Management:
- Challenge: Coordinating the dismantling, asbestos removal, and transportation of materials on a large site with multiple units requires careful planning and logistics.
- Solution: Establish a detailed project schedule that sequences the dismantling and removal activities to avoid bottlenecks and ensure smooth operations. Use on-site segregation and staging areas to manage materials, including separate areas for hazardous waste. Regular communication between project managers, contractors, and transport teams will ensure that materials are safely and efficiently removed from the site.
- Minimizing Disruption to Surrounding Areas:
- Challenge: The industrial units may be located near other operational businesses or residential areas, requiring measures to minimize disruption.
- Solution: Schedule the most disruptive activities during off-peak hours or weekends when possible. Implement noise and dust suppression techniques, such as sound barriers and water sprays, to reduce the impact on nearby areas. Provide regular updates to local stakeholders and maintain open lines of communication to address any concerns promptly.
- Completion within Timeframe and Budget:
- Challenge: Balancing the need for thorough, safe asbestos removal with the constraints of a fixed budget and timeline.
- Solution: Closely monitor the project’s progress against the timeline and budget, with contingency plans in place to address any unforeseen delays or issues. Use efficient project management tools to track resources, costs, and milestones, and adjust plans as needed to stay on target.
Similar Projects.
STRETFORD MALL REDEVELOPMENT PHASE 1
STRETFORD, MANCHESTER
View ProjectTRIDENT BUSINESS PARK
WARRINGTON
View ProjectDiscover total.
Explore our range of solutions designed to meet the diverse needs of our clients, from precision dismantling to environmentally conscious asset recovery.