GMFRS – BLACKLEY FIRE STATION
Project Details.
The extensive demolition and asbestos removal project at the former Blackley Fire Station involves the complete deconstruction of the existing..
Project Duration
.
Weeks
Days
Location
MANCHESTER
Status
Completed
April 2024
Project Value
£65K
Recycling Rate
Number of Site Staff
Services.
Key Challenges & Solutions.
Key Objectives:
- Safe Asbestos Removal: Systematically identify, remove, and safely dispose of all ACMs within the building, ensuring no health risks to workers or the public.
- Controlled Demolition: Execute the demolition of the fire station in a controlled and efficient manner, ensuring the structural integrity of nearby buildings is not compromised.
- Tight Programme Management: Adhere to a stringent project timeline to ensure that the demolition and asbestos removal are completed on schedule, facilitating the site's redevelopment.
- Logistics Coordination: Develop and implement a robust logistics plan to manage site access, waste removal, and material transport, minimizing disruption to surrounding areas.
- Ensuring Safety and Quality: Maintain the highest standards of safety and quality throughout the project, complying with all relevant regulations and industry best practices.
Key Challenges & Solutions:
- Tight Programme Management:
- Challenge: The project has a strict timeline that requires all activities, from asbestos removal to demolition and site clearance, to be completed within a fixed period.
- Solution: Implement a fast-track project management approach, with overlapping phases where possible. Utilize project management software to monitor progress, allocate resources efficiently, and quickly address any delays. Regular progress meetings with the project team and stakeholders will ensure alignment and swift resolution of any issues.
- Logistics Coordination:
- Challenge: The site’s urban location requires careful management of logistics to avoid disruptions to traffic and the local community.
- Solution: Develop a detailed logistics plan that includes designated routes for machinery and waste removal, scheduled deliveries, and strict traffic management. Engage with local authorities and the community to coordinate efforts, particularly during peak traffic times. Implement on-site material storage and handling protocols to reduce congestion.
- Ensuring Safety:
- Challenge: The presence of asbestos and the need for controlled demolition pose significant safety risks.
- Solution: Engage specialized contractors for asbestos removal, ensuring they are fully certified and experienced. Enforce rigorous health and safety protocols, including personal protective equipment (PPE), air monitoring, and exclusion zones around active work areas. Conduct regular safety audits and provide ongoing training to all personnel.
- Maintaining Quality of Service:
- Challenge: Ensuring high-quality workmanship while meeting the project’s tight schedule.
- Solution: Establish a robust quality assurance (QA) program, with regular inspections and audits to ensure all work meets or exceeds industry standards. Engage experienced demolition contractors with a proven track record in similar projects. Set clear benchmarks for quality and provide detailed reports to the client on project milestones.
The demolition and asbestos removal project at the former Blackley Fire Station is a complex operation requiring precise planning, expert execution, and stringent adherence to safety and quality standards. By focusing on key objectives such as tight programme management, logistics coordination, and ensuring safety, the project team is committed to delivering a successful outcome that prepares the site for future redevelopment. Through careful management of risks, close coordination with stakeholders, and a strong commitment to quality, the project will be completed on time, within budget, and with minimal disruption to the surrounding community.