totaldemolition-shapedivider-2@1x

IRLAM HOUSE

Back to Projects

Project Details.

The Irlam House project involves the extensive internal soft strip of a 15-storey tower block located in the heart of..
Read more

Project Duration

.

0

Weeks

0

Days

Location

BOOTLE, LIVERPOOL

Status

Project Value

£175K

Recycling Rate

0%

Number of Site Staff

0

Services.

A range of services performed, reflecting Total Demolition's diverse capabilities and comprehensive solutions.
High Rise| Soft Strip Works

Key Challenges & Solutions.

Key Challenges & Solutions:

  1. Tight Programme Management:
    • Challenge: The project requires completion within a fixed timeline to align with the broader redevelopment schedule.
    • Solution: Utilize detailed project scheduling tools to closely monitor progress and adjust resources as needed to stay on track. Implement overlapping work streams where possible, allowing different teams to work simultaneously on different floors without compromising safety.
  2. Logistics Coordination:
    • Challenge: The logistics of stripping a 15-storey building in a busy urban area are complex, particularly in terms of waste removal and material handling.
    • Solution: Develop a phased approach to logistics, ensuring that materials are moved efficiently within the building and waste is removed regularly to avoid bottlenecks. Coordinate closely with local authorities for road access and waste removal schedules, minimizing the impact on the local community.
  3. Ensuring Safety:
    • Challenge: Working at height and in confined spaces presents significant safety risks, particularly during the removal of heavy or hazardous materials.
    • Solution: Engage experienced contractors and provide comprehensive safety training for all workers. Implement strict fall protection measures, regular safety drills, and continuous monitoring of air quality and structural stability. Enforce PPE use at all times, with regular audits to ensure compliance.
  4. Maintaining Quality of Service:
    • Challenge: High standards of workmanship must be maintained throughout the project, despite the tight schedule.
    • Solution: Implement a robust quality control system with regular inspections at each phase of the project. Engage experienced supervisors to oversee the work and ensure that all tasks are completed to the required standards. Maintain clear communication with the client to ensure that expectations are met or exceeded.

The internal soft strip project at Irlam House in Bootle, Liverpool, is a complex and demanding undertaking, requiring careful planning, expert execution, and a strong commitment to safety and quality. By focusing on the key objectives of efficient internal stripping, tight programme management, and meticulous logistics coordination, the project team is dedicated to delivering a successful outcome that prepares the building for its next phase of redevelopment. Through the implementation of stringent safety measures, rigorous quality control, and proactive community engagement, the project will be completed on time, within budget, and with minimal disruption to the surrounding area.

Similar Projects.

totaldemolition-shapedivider-2@1x
totaldemolition-icon-map-red

Discover total.

Explore our range of solutions designed to meet the diverse needs of our clients, from precision dismantling to environmentally conscious asset recovery.

Talk to us about your next project