OLD STORE BUILDING
Project Details.
TOTAL Controlled Demolition Services was appointed to carry out the careful deconstruction and asbestos removal works of..
Project Duration
.
Weeks
Days
Location
CARRINGTON, MANCHESTER
Status
In Progress
Project Value
£220K
Recycling Rate
Number of Site Staff
Services.
Key Challenges & Solutions.
1. Proximity to a Live Substation:
The most significant challenge was the close location of a live electricity substation, positioned directly adjacent to one elevation of the building. This asset was fully operational and could not be isolated at any point during works.
To manage this risk:
-
A bespoke demolition sequence was developed in consultation with structural engineers and the client.
-
Works progressed from the opposite side of the building, gradually moving toward the substation to maintain a buffer zone throughout.
-
A temporary protective barrier system was installed to physically shield the substation from debris or unplanned contact.
-
Only experienced operatives were assigned to work in this zone, with additional spotters and banksmen in place at all times.
2. Restricted Access and Working Room:
Due to the presence of surrounding infrastructure and services, machinery movement was restricted. Our team deployed compact, high-reach equipment and carried out portions of the works using manual deconstruction techniques to maintain precision.
3. Environmental Management:
Dust, noise, and vibration controls were implemented to protect both the operational substation and nearby stakeholders. This included the use of mist cannons, acoustic barriers, and real-time monitoring throughout the duration of works.